2025–26
Safety & Fire2025–26

Safety & Fire Updates

  • —Fire hooters fully functional
  • —MCP equipment upgraded
  • —DG set repaired
  • —Weekly lift emergency checks introduced as standing protocol
  • —CCTV and lift camera integration upgraded
  • —Live CCTV feed at main gate with audio for all lifts and common areas
Lifts2025–26

Lifts Updates

  • —Pulley replacement completed across towers
  • —Battery replacement and UPS serviced
  • —Door motor repaired across towers
Civil / Infrastructure2025–26

Civil / Infrastructure Updates

  • —Chajja cleaning completed for Towers A, B, C, D, and E
  • —Ongoing tile repair drive underway
  • —Signboards refreshed; material trolleys added
  • —Parking bays re-marked
  • —New utility rooms — Amphitheater and Association Room constructed and furnished
  • —3 new classrooms added (Aster, Euryops, Ikebana)
Water / STP / WTP2025–26

Water / STP / WTP Updates

  • —WTP pipeline repaired
  • —STP butterfly valve replaced
  • —Final water distribution pipeline work done
  • —Pressure tank replaced to restore water supply consistency
Electrical2025–26

Electrical Updates

  • —Aster panel auto-changeover switch replaced
  • —Festive and common-area lighting installed
  • —Wi-Fi nodes added in basement to strengthen CCTV uptime
Sports & Recreation2025–26

Sports & Recreation Updates

  • —Football goal posts installed
  • —Cricket turf fully laid and opened
  • —Grass volleyball court inaugurated on 15 August 2026
  • —Snooker table and area maintained and upgraded
  • —FnG badminton courts upgraded with enclosed structure
  • —Table tennis area given new flooring
Gym2025–26

Gym Updates

  • —Gym fully reopened after renovation
  • —New equipment installed
  • —Flooring replaced
  • —Fresh coat of paint
Landscape & Pool2025–26

Landscape & Pool Updates

  • —New plants added across common areas
  • —Tower lobbies planted and mud removed from ABCD towers
  • —Soil replenished with fertilizer after 8 years
  • —Nursery setup near STP plant
  • —Topiaries setup outside each tower
  • —Pool area upgraded with umbrellas and improved lighting
Facilities / Helpdesk2025–26

Facilities / Helpdesk Updates

  • —FM Helpdesk operational Mon–Sun (Wed off), 9 AM–6 PM for non-emergency requests
  • —Plumbing and electrical services outsourced to AB Group Facility Management for better SLA and accountability
2024
Water ManagementDecember

Advanced Water Management System

  • —STP treated water supply maintenance across towers
  • —Pipeline cleaning and repair work completed
  • —Emergency water storage during Kaveri shutdown (6–7 lakh litres buffer)
  • —85% Cauvery water supply achieved — 65% reduction in monthly water costs
SecurityNovember

Complete Security Infrastructure Overhaul

  • —120 high-resolution CCTV cameras — no blind spots remaining
  • —20 lifts equipped with 270° PTZ cameras with night vision
  • —Park+ RFID tag system for all vehicles
  • —Traffic light system (Green = Access, Red = Denied)
  • —Back gate and Narayana gate automation completed
SportsOctober

Enhanced Sports Facilities

  • —Three badminton courts completed (Clubhouse, Fennel, Gardenia)
  • —Professional TT flooring with TTFI approved PVC vinyl
  • —Gym renovation with new equipment and rubber tiles
  • —Indoor Games Room with table tennis, carrom, board games
  • —KL Sports Meet 2024 organized after 3-year hiatus
InfrastructureSeptember

Power & Technology Upgrades

  • —Automatic changeover switch replacement completed
  • —DG backup system optimization (50-second response time)
  • —75 tubelights installed in ABCDE basement
  • —3 EV Charging Stations (two 3.3kW, one 7.4kW)
  • —Removed Airtel monopoly; introduced ACT internet provider
SafetyAugust

Comprehensive Safety Systems

  • —Fire alarm system testing and maintenance completed
  • —Fire equipment inspection and upgrades
  • —AMC renewed for fire safety equipment
  • —Regular fire drills conducted
EnvironmentJuly

Green Campus Initiative

  • —80 trees planted — Mahogany, Neem, Jamun, Pink Trumpet
  • —Free saplings from BBMP and forest department
  • —Topiary installations: Antelope, Bear, Cat, Dolphin, Elephant, Flamingo, Giraffe
  • —Rainwater harvesting system (5 lakh litres with carbon filter)
  • —Polycarbonate sheet installation for vehicle protection in basement
RecreationJune

Aquatic & Recreational Facilities

  • —3 heavy-duty aluminium umbrellas (9-foot diameter) at pool
  • —Waterfall and Rain Shower features (weekends 12pm–2pm)
  • —Amphitheatre construction completed
  • —Ikebana space opening and upgrade
  • —Guest Car Park in F&G block basement
Community ServiceMay

Resident Welfare Initiatives

  • —Fresh water cooler installation for service providers
  • —Water Cooler donated by KL Senior Citizen Sewa Smiti
  • —Featured in Bangalore Mirror for community service
  • —Cargo utility trolley for heavy item transport
2023
AdministrationJanuary

KLAOA Formally Established

  • —KLAOA formally established under Karnataka Apartment Ownership Act, 1972
  • —First elections conducted under supervision of retired judge
  • —Elections video-recorded for transparency
  • —New board members selected to navigate formative year
InfrastructureApril

Initial Infrastructure Development

  • —Indoor Games Room established
  • —Boom Barrier installation completed
  • —Amphitheatre construction initiated
  • —20 lifts equipped with new 270° PTZ cameras
  • —Additional 10 cameras in basement of A–E towers